During August, the extension work was concluded on the Portiso France factory, located in Peyrat le Château (87). The new building, using PAP panels, has allowed the production area to be increased by 750 m² and has created a storage area for finished and semi-finished products. It has also been used to restructure the storage and packaging area. New work tables were installed and the entire aluminium section was restructured.
This increase in production capacity is key for us to be able to cope with the huge increase in demand for doors which has been seen in recent years and allow us to provide better services to our clients.